HomeMy WebLinkAboutE.8 - Staff Report - Rancho Park Playground Replacement CONSENT ITEM
E-8
TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
VIA: SERGIO GONZALEZ, CITY MANAGER
FROM: ROBERT DELGADILLO, P.E., DIRECTOR OF PUBLIC WORKS/ CITY ENGINEER
DATE: AUGUST 18, 2025
SUBJECT: APPROVE THE PURCHASE AND INSTALLATION OF PLAYGROUND
EQUIPMENT AND SHADE STRUCTURE AT RANCHO PARK, 1357 MACNEIL
DRIVE BY INNOVATIVE PLAYGROUNDS COMPANY
BACKGROUND:
Rancho Park’s existing playground is outdated and in need of replacement. The city plans to upgrade the
site with brand-new playground equipment and a shade structure to enhance safety, accessibility, and
enjoyment for the community.
This action authorizes the purchase and installation of the new playground equipment at Rancho Park
from the Innovative Playgrounds Company.
RECOMMENDATIONS:
Staff recommends the City Council take the following actions:
1)In accordance with Azusa Municipal Code Sec. 2-521. – Cooperative, piggyback and multiple
awarded bid purchasing with other agencies, approve the purchase and installation of new
playground equipment from the Innovative Playgrounds Company in an amount of $295,865.99,
plus a contingency of the remaining available project budget of $24,134.01 for potential change
orders, for a total not-to-exceed $320,000; and
2)Authorize the City Manager to execute the Construction Agreement, in a form acceptable to the
City Attorney, on behalf of the City.
ANALYSIS:
Rancho Park’s existing playground equipment has deteriorated from years of use and is due for
replacement. The new equipment will be built for high quality, durability, and longevity, offering a safe
APPROVED
CITY COUNCIL
8/18/2025
Rancho Park Equipment Replacement
August 18, 2025
Page 2
and enjoyable space for children and families. A shade structure will also be added for comfort and
protection.
The City’s purchasing procedures allow for the purchase and installation of the new park equipment
using the cooperative agreement provision outlined in the municipal code. The Innovative Playgrounds
Company has provided the City with a cooperative agreement through Sourcewell (Contract #010521-
BUR), enabling the City to benefit from competitive pricing without incurring the costs associated with
standard procurement processes.
FISCAL IMPACT:
The recommended action approves the purchase of park equipment from the Innovative Playgrounds
Company in an amount of $295,865.99, plus a contingency of the remaining available project budget of
$24,134.01 for potential change orders, for a total not-to-exceed $320,000. The Rancho Park
Playground Equipment Replacement project was approved for a total budget of $320,000 in the FY
2025-26 CIP budget including $150,000 in QUIMBY Fund under acct # 19-80-000-666-7120/66626C-
7120 and $170,000 in Rosedale Community Facility District Park Maintenance Fund under acct # 37-
80-000-000-7120/66626D-7120.
Prepared by: Reviewed by:
Natalie Reagan Robert Delgadillo, P.E.
Management Analyst Director of Public Works/ City Engineer
Reviewed and Approved:
Sergio Gonzalez
City Manager
Attachments:
1) The Innovative Playgrounds Company Sourcewell Quote
2) The Innovative Playgrounds Company Rendering
3) Construction Agreement
ESTIMATE VALID FOR 30 DAYS
Acceptance of estimate: the above prices, specifications and conditions are satisfactory and are hereby accepted. Any alterations or deviations from the above
will be accepted only upon written notice and will become an extra charge over and above the estimate period. 50% deposit due with order, unless net 30
terms have been approved.
Innovative Playgrounds Co., Inc.
12407 E. Slauson Ave. Unit D
Whittier, CA 90606
562-693-5200
www.innovplay.com
Estimate
ADDRESS
CITY OF AZUSA
213 E FOOTHILL BLVD
AZUSA, CA 91702
SOURCEWELL ID #39911
SHIP TO
Rancho Park
1357 Macneil Dr.
Glendora, CA 91741
ESTIMATE #DATE
11051 08/07/2025
TRACKING NO.SALES REP
Play Unit w/ Integrated Shade ALVINO
ACTIVITY DESCRIPTION AMOUNT
DEMO- PLAY Demo and dispose of all existing play equipment.11,830.99
DEMO Demo and dispose of approx. (3,985) sq. ft. of existing woodchips at 14" depth.28,007.25
PREP WORK Construct (1) gravel sump drain in play area.2,112.68
PLAY UNIT Supply Burke Play Equipment as Per Drawing #513-204405-2, Includes (1) "Nucleus Fire Truck Series" Unit
for 5-12 Age Group with 5" OD Aluminum Posts with integrated shade sails, (1) Rev8 Spinner, (1) Burke 5"
OD Double Bay Single Post Swing at 8' Toprail with (2) Belt Seats, (2) Tot Seats with Chains and integrated
shade canopy, and (1) Freestanding Safety/Welcome Age Sign. Supply (5) Burke Playmat 3' x 5' x 2", Model
# 046-0536.
LIST PRICE: $148,931.00
"SOURCEWELL CUSTOMER DISCOUNT" APPLIED: ($22,339.65)
(Burke Sourcewell Contract # 010521-BUR)
126,591.35T
KIT-2 FREE Maintenance Kit (includes installation booklet, graffiti remover, tools and touch up Paint).
LIST PRICE $250.00
0.00T
WARRANTY LONGEST AND STRONGEST WARRANTY, INCLUDING UV-20 PROTECTION ON PLASTICS.0.00
INSTALLATION-1 Install Burke Play Equipment as per drawing #513-204405-2 into dirt.75,503.24
INSTALLATION-1 Supply and install (3,985) sq. ft. of weedblock fabric.9,260.92
PLAY CHIPS Supply and Blow-in approx. (225) cubic yards of playground woodchip surfacing.17,112.68
TEMP. FENCING Provide temporary fencing during installation of play equipment and play area surfacing.2,218.31
FREIGHT Burke shipping charge to GLENDORA, CA. Freight price valid for 30 days only, due to fluctuating fuel pricing.
Please requote after 09/05/25.
9,620.00
INCLUDES Pricing includes prevailing wage rates.0.00T
EXCLUDES Pricing excludes regular wage rates, permits, bonds, any border material and/or concrete curbing, fencing
(permanent), special installation due to unforeseen site conditions and any additional site
work/preparation/amenities. Direct cost for any additional insurance limits above what is offered on our current
policy for GL, WC, and Auto will be directly charged to customer if required by contract.
0.00T
PAYMENT TERMS:
NET 30 ON PO'S FROM CITIES, SCHOOL DISTRICTS, STATE, OR FEDERAL ENTITIES.
ESTIMATE VALID FOR 30 DAYS
Acceptance of estimate: the above prices, specifications and conditions are satisfactory and are hereby accepted. Any alterations or deviations from the above
will be accepted only upon written notice and will become an extra charge over and above the estimate period. 50% deposit due with order, unless net 30
terms have been approved.
SUBTOTAL 282,257.42
TAX (10.75%) 13,608.57
TOTAL $295,865.99
Accepted By Accepted Date
CONTRACT
- 1 -
CITY OF AZUSA STANDARD CONTRACT
RANCHO PARK PLAYGROUND EQUIPMENT REPLACEMENT PROJECT
PROJECT NO. 66626C-7120
THIS CONTRACT is made this____day of August, 2025, in the County of Los
Angeles, State of California, by and between the City of Azusa, hereinafter called City, and
Innovative Playgrounds Company, hereinafter called Contractor. The City and the Contractor for
the considerations stated herein agree as follows:
ARTICLE 1. SCOPE OF WORK. The Contractor shall perform all Work within the time
stipulated in the Contract and shall provide all labor, materials, equipment, tools, utility services,
and transportation to complete all of the Work required in strict compliance with the Contract
Documents as specified in Article 5 below for the following Project:
RANCHO PARK PLAYGROUND EQUIPMENT REPLACEMENT PROJECT
PROJECT NO. 66626C-7120
The Contractor and its surety shall be liable to the City for any damages arising as a result of the
Contractor’s failure to comply with this obligation.
ARTICLE 2. TIME FOR COMPLETION. The Work shall be commenced on the date stated
in the City’s Notice to Proceed. The Contractor shall complete all Work required by the Contract
Documents within XX working days from the commencement date stated in the Notice to
Proceed. By its signature hereunder, Contractor agrees the time for completion set forth above is
adequate and reasonable to complete the Work.
ARTICLE 3. CONTRACT PRICE. The City shall pay to the Contractor as full compensation
for the performance of the Contract, subject to any additions or deductions as provided in the
Contract Documents, and including all applicable taxes and costs, the sum of Two Hundred
Ninety-Five Thousand Eight Hundred Sixty-Five Dollars and Ninety-Nine Cents ($295,865.99).
Payment shall be made as set forth in the General Conditions.
ARTICLE 4. LIQUIDATED DAMAGES. In accordance with Government Code section
53069.85, it is agreed that the Contractor will pay the City the sum of $300 for each and every
calendar day of delay beyond the time prescribed in the Contract Documents for finishing the
Work, as Liquidated Damages and not as a penalty or forfeiture. In the event this is not paid, the
Contractor agrees the City may deduct that amount from any money due or that may become due
the Contractor under the Contract. This Article does not exclude recovery of other damages
specified in the Contract Documents.
ARTICLE 5. COMPONENT PARTS OF THE CONTRACT. The “Contract Documents”
include the following:
CONTRACT
- 2 -
Contract
Performance Bond
Payment Bond
General Conditions
Special Conditions
Technical Specifications
Plans and Drawings
Approved and fully executed change orders
Any other documents contained in or incorporated into the Contract
The Contactor shall complete the Work in strict accordance with all of the Contract Documents.
All of the Contract Documents are intended to be complementary. Work required by one of the
Contract Documents and not by others shall be done as if required by all. This Contract shall
supersede any prior agreement of the parties.
ARTICLE 6. PROVISIONS REQUIRED BY LAW. Each and every provision of law
required to be included in these Contract Documents shall be deemed to be included in these
Contract Documents. The Contractor shall comply with all requirements of the California Labor
Code applicable to this Project.
ARTICLE 7. INDEMNIFICATION. Contractor shall provide indemnification as set forth in
the General Conditions.
ARTICLE 8. PREVAILING WAGES. Contractor shall be required to pay the prevailing rate
of wages in accordance with the Labor Code which such rates shall be made available at Azusa
City Hall or may be obtained online at http//www.dir.ca.gov/dlsr and which must be posted at the
job site.
ARTICLE 9. DECLARATION OF POLITICAL CONTRIBUTIONS. Consultant shall,
throughout the term of this Agreement, submit to City an annual statement in writing declaring
any political contributions of money, in-kind services, or loan made to any member of the city
council within the previous twelve-month period by the Consultant and all of Consultant's
employees, including any employee(s) that Consultant intends to assign to perform the Services
described in this Agreement.
ARTICLE 10. CONFLICT OF INTEREST. In the procurement of supplies, equipment,
construction, and services by sub-recipients, the conflict of interest provisions in (State LCA –
24 CFR 85.36 and Non-Profit Organizations – 24 CFR 84.4), OMB Circular A-110, and 24 CFR
570.611, respectively, shall apply. No employee, officer or agent of the sub-recipient shall
participate in selection, or in the award or administration of a contract supported by Federal
funds if a conflict of interest, real or apparent, would be involved.
CONTRACT
- 3 -
IN WITNESS WHEREOF, this Contract has been duly executed by the above-named
parties, on the day and year above written.
INNOVATIVE PLAYGROUNDS CO.
________________________________
Name and Title
________________________________
Signature of Contractor
License No. ______________________
CITY OF AZUSA
_______________________________
Sergio Gonzalez
City Manager
________________________________
Jeffrey Lawrence Cornejo Jr.
City Clerk
Approved as to Form:
______________________________
Best Best & Krieger LLP
City Attorney
BONDS
- 4 -
PERFORMANCE BOND
FOR
RANCHO PARK PLAYGROUND EQUIPMENT REPLACEMENT PROJECT
PROJECT NO. 66626C-7120
KNOW ALL PERSONS BY THESE PRESENTS:
THAT WHEREAS, City of Azusa (hereinafter referred to as “City”) has awarded to Innovative
Playgrounds Company, (hereinafter referred to as the “Contractor”) an agreement for Project No.
66626C (hereinafter referred to as the “Project”).
WHEREAS, the work to be performed by the Contractor is more particularly set forth in the
Contract Documents for the Project, (hereinafter referred to as “Contract Documents”), the terms
and conditions of which are expressly incorporated herein by reference; and
WHEREAS, the Contractor is required by said Contract Documents to perform the terms thereof
and to furnish a bond for the faithful performance of said Contract Documents.
NOW, THEREFORE, we, Innovative Playgrounds Company, the undersigned Contractor and
_____________________________________________ as Surety, a corporation organized and
duly authorized to transact business under the laws of the State of California, are held and firmly
bound unto the City in the sum of Two Hundred Ninety-Five Thousand Eight Hundred Sixty-
Five Dollars and Ninety-Nine Cents ($295,865.99), said sum being not less than one hundred
percent (100%) of the total amount of the Contract, for which amount well and truly to be made,
we bind ourselves, our heirs, executors and administrators, successors and assigns, jointly and
severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH, that, if the Contractor, his or its heirs,
executors, administrators, successors or assigns, shall in all things stand to and abide by, and
well and truly keep and perform the covenants, conditions and agreements in the Contract
Documents and any alteration thereof made as therein provided, on its part, to be kept and
performed at the time and in the manner therein specified, and in all respects according to their
intent and meaning; and shall faithfully fulfill all obligations including the one-year guarantee of
all materials and workmanship; and shall indemnify and save harmless the City, its officers and
agents, as stipulated in said Contract Documents, then this obligation shall become null and void;
otherwise it shall be and remain in full force and effect.
As a part of the obligation secured hereby and in addition to the face amount specified therefore,
there shall be included costs and reasonable expenses and fees including reasonable attorney’s
fees, incurred by City in enforcing such obligation.
As a condition precedent to the satisfactory completion of the Contract Documents, unless
otherwise provided for in the Contract Documents, the above obligation shall hold good for a
period of one (1) year after the acceptance of the work by City, during which time if Contractor
shall fail to make full, complete, and satisfactory repair and replacements and totally protect the
City from loss or damage resulting from or caused by defective materials or faulty workmanship.
BONDS
- 5 -
The obligations of Surety hereunder shall continue so long as any obligation of Contractor
remains. Nothing herein shall limit the City’s rights or the Contractor or Surety’s obligations
under the Contract, law or equity, including, but not limited to, California Code of Civil
Procedure section 337.15.
Whenever Contractor shall be, and is declared by the City to be, in default under the Contract
Documents, the Surety shall remedy the default pursuant to the Contract Documents, or shall
promptly, at the City’s option:
(1) Take over and complete the Project in accordance with all terms and conditions in
the Contract Documents; or
(2) Obtain a bid or bids for completing the Project in accordance with all terms and
conditions in the Contract Documents and upon determination by Surety of the
lowest responsive and responsible bidder, arrange for a Contract between such
bidder, the Surety and the City, and make available as work progresses sufficient
funds to pay the cost of completion of the Project, less the balance of the contract
price, including other costs and damages for which Surety may be liable. The
term “balance of the contract price” as used in this paragraph shall mean the total
amount payable to Contractor by the City under the Contract and any
modification thereto, less any amount previously paid by the City to the
Contractor and any other set offs pursuant to the Contract Documents.
(3) Permit the City to complete the Project in any manner consistent with California
law and make available as work progresses sufficient funds to pay the cost of
completion of the Project, less the balance of the contract price, including other
costs and damages for which Surety may be liable. The term “balance of the
contract price” as used in this paragraph shall mean the total amount payable to
Contractor by the City under the Contract and any modification thereto, less any
amount previously paid by the City to the Contractor and any other set offs
pursuant to the Contract Documents.
Surety expressly agrees that the City may reject any contractor or subcontractor which may be
proposed by Surety in fulfillment of its obligations in the event of default by the Contractor.
Surety shall not utilize Contractor in completing the Project nor shall Surety accept a bid from
Contractor for completion of the Project if the CITY, when declaring the Contractor in default,
notifies Surety of the City’s objection to Contractor’s further participation in the completion of
the Project.
The Surety, for value received, hereby stipulates and agrees that no change, extension of time,
alteration or addition to the terms of the Contract Documents or to the Project to be performed
thereunder shall in any way affect its obligations on this bond, and it does hereby waive notice of
any such change, extension of time, alteration or addition to the terms of the Contract Documents
or to the Project.
BONDS
- 6 -
IN WITNESS WHEREOF, we have hereunto set our hands and seals this _______ day of
______________________, 2025.
_________________________________________
CONTRACTOR/PRINCIPAL
_________________________________________
Name
By_______________________________________
SURETY:
By: ______________________________________
Attorney-In-Fact
The rate of premium on this bond is ____________ per thousand. The total amount of premium
charges, $_______________________________.
(The above must be filled in by corporate attorney.)
THIS IS A REQUIRED FORM
Any claims under this bond may be addressed to:
(Name and Address of Surety) ___________________________________________
___________________________________________
___________________________________________
(Name and Address of Agent or ___________________________________________
Representative for service of
process in California, if different ___________________________________________
from above)
___________________________________________
(Telephone number of Surety and ___________________________________________
Agent or Representative for service
of process in California
BONDS
- 7 -
STATE OF CALIFORNIA
COUNTY OF
On before me, (here insert
name and title of the officer), personally appeared , who proved
to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to
the within instrument and acknowledged to me that he/she/they executed the same in
his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the
person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under penalty of perjury under the laws of the State of California that the foregoing
paragraph is true and correct.
WITNESS my hand and official seal.
Signature __________________________________
(Seal)
NOTE: A copy of the Power-of-Attorney to local representatives of the bonding company must
be attached hereto.
BONDS
- 8 -
PAYMENT BOND
FOR
RANCHO PARK PLAYGROUND EQUIPMENT REPLACEMENT PROJECT
PROJECT NO. 66626C-7120
KNOW ALL MEN BY THESE PRESENTS That
WHEREAS, the City of Azusa (hereinafter designated as the “City”) has awarded to Innovative Playgrounds Company, hereinafter designated as the “Principal,” a contract for the work described as follows: Project No.66626C (the “Project”); and
WHEREAS, said Principal is required to furnish a bond in connection with said contract; providing that if said Principal or any of its Subcontractors shall fail to pay for any materials, provisions, provender, equipment, or other supplies used in, upon, for or about the performance of the work contracted to be done, or for any work or labor done thereon of any kind, or for amounts due under the Unemployment Insurance Code or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages of employees of said Principal and its Subcontractors with respect to such work or labor the Surety on this bond will pay for the same to the extent hereinafter set forth.
NOW THEREFORE, we, the Principal and __________________________ as Surety, are held and firmly bound unto the City in the penal sum of Two Hundred Ninety-Five Thousand Eight Hundred Sixty-Five Dollars and Ninety-Nine Cents ($295,865.99) lawful money of the United States of America, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH that if said Principal, his or its subcontractors, heirs, executors, administrators, successors or assigns, shall fail to pay any of the persons named in Section 3181 of the Civil Code, fail to pay for any materials, provisions or other supplies, used in, upon, for or about the performance of the work contracted to be done, or for any work or labor thereon of any kind, or amounts due under the Unemployment Insurance Code with respect to work or labor performed under the contract, or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department or Franchise Tax Board from the wages of employees of the contractor and his subcontractors pursuant to Section 18663 of the Revenue and Taxation Code, with respect to such work and labor the Surety or Sureties will pay for the same, in an amount not exceeding the sum herein above specified, and also, in case suit is brought upon this bond, all litigation expenses incurred by the City in such suit, including reasonable attorneys’ fees, court costs, expert witness fees and investigation expenses.
This bond shall inure to the benefit of any of the persons named in Section 3181 of the Civil Code so as to give a right of action to such persons or their assigns in any suit brought upon this bond.
It is further stipulated and agreed that the Surety on this bond shall not be exonerated or released from the obligation of this bond by any change, extension of time for performance, addition, alteration or modification in, to, or of any contract, plans, specifications, or agreement pertaining or relating to any scheme or work of improvement
BONDS
- 9 -
herein above described, or pertaining or relating to the furnishing of labor, materials, or equipment therefore, nor by any change or modification of any terms of payment or extension of the time for any payment pertaining or relating to any scheme or work of improvement herein above described, nor by any rescission or attempted rescission or attempted rescission of the contract, agreement or bond, nor by any conditions precedent or subsequent in the bond attempting to limit the right of recovery of claimants otherwise entitled to recover under any such contract or agreement or under the bond, nor by any fraud practiced by any person other than the claimant seeking to recover on the bond and that this bond be construed most strongly against the Surety and in favor of all persons for whose benefit such bond is given, and under no circumstances shall Surety be released from liability to those for whose benefit such bond has been given, by reason of any breach of contract between the owner or City and original contractor or on the part of any obligee named in such bond, but the sole conditions of recovery shall be that claimant is a person described in Section 3110 or 3112 of the Civil Code, and has not been paid the full amount of his claim and that Surety does hereby waive notice of any such change, extension of time, addition, alteration or modification herein mentioned.
IN WITNESS WHEREOF, two (2) identical counterparts of this instrument, each of which shall for all purposes be deemed unoriginal thereof, have been duly executed by the Principal and Surety above named, on the _____ day of ______________________ 2025 the name and corporate seal of each corporate party being hereto affixed and these presents duly signed by its undersigned representative pursuant to authority of its governing body.
(Corporate Seal of Principal,
if corporation) Principal (Property Name of
Contractor)
By
(Signature of Contractor)
(Seal of Surety)
Surety
By
Attorney in Fact
(Attached Attorney-In-Fact
Certificate and Required
Acknowledgements)
*Note: Appropriate Notarial Acknowledgments of Execution by
Contractor and +surety and a power of Attorney MUST BE ATTACHED.